一个人看B站直播-欧美一线二线三线四线-亚洲人成电影免费观看在线看-日本精品久久久-性色av一区二区三区-久久国产精品露脸精品国产蜜桃

Feedback

Navigation:Home  ? News  ?  Company News

the gas pretreatment equipment to be used in the Tunlan Gas Generation project is going to be delivered

  • Published: 2017-05-27 16:56:00
  • Hits: 1945

We have signed with Xishan Coal Electricity Group the Agreement on Tunlan Gas Generation Project (Phase Three) Gas Pretreatment System. The project has a total treatment capacity of 4000Nm3/h and the equipment will be shipped in containers. We have carefully designed the products, effectively organized the production, and checked every product strictly before delivery. We have performed our duties under the agreement with both quality and quantity guaranteed. We have met all the technical performance requirements of the project. The equipment is now ready to be shipped to the project site under the proprietor’s instructions.


Equipment name: Gas Pretreatment System in Containers



Project Location: Tunlan Gas Generation Project Phase Three site, Gujiao, Shanxi



Size: 4000Nm3/h treatment capacity



Tel:025-84414484 Fax:025-86647595 Address:Wenying Road No.3,Binjiang Development Zone Jiangning District,Nanjing City


      Copyright by Nanjing Carbon Recycle Biomass Energy Co.,Ltd.
一个人看B站直播-欧美一线二线三线四线-亚洲人成电影免费观看在线看-日本精品久久久-性色av一区二区三区-久久国产精品露脸精品国产蜜桃